Know which method statements aren’t approved — before the work they cover starts.

A method statement approved at tender is not the same as a method statement approved for the work starting on Sunday. Scope changes, the sequence changes, the risk assessment moves — and the register still shows a green tick. The question is not “do we have a method statement?” It is “is the right one approved and in force for this specific activity, now?”

Why “approved once” isn’t approved

A method statement and its risk assessment travel together as RAMS: the risk assessment identifies the hazards, and the method statement sets out, step by step, how the job is done and how each hazard is controlled. On a live UAE project both change as the work changes. An approval captured months ago at tender tells you little about whether the current method for the current sequence is signed off. Storing the document does not watch whether its approval still holds. (Why document control isn’t a reasoning layer.)

What Aven-AI does with your method statements

Aven-AI reads your method-statement register against the programme. It sees the high-risk work coming up and checks whether the governing method statement is approved and consistent with its risk assessment, permit and drawings before the activity starts. Fourteen days before a façade package begins, it can tell you the method statement isn’t approved — early enough to fix, not in the post-incident review. It connects the method statement to the permit it supports and the work it governs, instead of leaving them in separate silos. (How readiness breaks down before high-risk work.)

What it does not do — on purpose

Aven-AI does not route method statements for sign-off, approve or reject them, or replace competent engineering and HSE review. It flags that an approval is missing or a control is contradictory and cites the exact record; the approval itself stays with the people who hold that duty. That is the point of a governed advisory layer — it watches every method statement without taking the approval decision away from your team.

RAMS done right for UAE high-risk work

Built by an HSE professional with nineteen years on UAE sites, Aven-AI reflects how RAMS and permits are expected to work under standards like CDM 2015, and the real-site truth that a method statement on file is not yet a method statement in force at the workface.

Prove it on one activity

See it on real work through the Critical Work Readiness Scan: submit one activity’s method statement, risk assessment, permit and look-ahead and get a red/amber/green readiness verdict plus a prioritised gap register in 48 hours. It sits inside the full HSE platform, which reads across observations, incidents, HIRAs, method statements, permits and toolbox talks so nothing approved-in-name-only slips through.